Railway Station at Vác
From July 2013 to July 2015 DDC was involved in the rebuilding and modernizing works of the railway station in Vác and in the establishment of its associated infrastructure elements. Our company provided 15.760 m3 of concrete to the large scale project, and it was used for special solutions such as the building of the pump pipe below the rails or night concreting. The high quality of the structure concretes was an absolute must during construction, therefore tests were made at every work phase, which confirmed the excellent performance of DDC’s products.
Location
Széchenyi út 42.2600 Vác (Hungary)
Vác Railway Station.
Duna-Dráva Cement Kft.
Vác Railway Station.
Duna-Dráva Cement Kft.
Vác Railway Station.
Duna-Dráva Cement Kft.
Vác Railway Station.
Duna-Dráva Cement Kft.
Vác Railway Station.
Duna-Dráva Cement Kft.
Vác Railway Station.
Duna-Dráva Cement Kft.
Vác Railway Station.
Duna-Dráva Cement Kft.
Vác Railway Station.
Duna-Dráva Cement Kft.
Vác Railway Station.
Duna-Dráva Cement Kft.
Vác Railway Station.
Duna-Dráva Cement Kft.
Vác Railway Station.
Duna-Dráva Cement Kft.
Vác Railway Station.
Duna-Dráva Cement Kft.
Vác Railway Station.
Duna-Dráva Cement Kft.
Vác Railway Station.
Duna-Dráva Cement Kft.