2013.09.25 - 2014.11.10. között a Hankook Performace Tires megépítette új gyárát Dunaújvároson. A kivitelezés során betonüzemünk a gyártócsarnok sor építéséhez szolgáltatott betont. A összes betonszükséglet körülbelül 30 000 m3 betont jelentett, amiből a DDC 16 000 m3-t szállított.

Hankook Performance Tires at Dunaújváros

The construction of the new production hall of Hankook Performance Tires in Dunaújváros began in September 2013 with the involvement of Duna-Dráva Cement Ltd. During the project, which concluded in November 2014, our concrete plant provided high quality concrete material for the building of the structure. The total amount of concrete used was about 30 000 m³, of which DDC delivered almost the half, 16 000 m3.

During the project mainly the following product types were used:

  • C25/30-XC2-16-F3: 8 000 m3
  • C30/37-XC2-XA1-24-F3: 3 000 m3
  • C30/37-XC4-XF4-16-F3: 1 500 m3

Project details

  • 2014

    Completion

  • Beginning of construction: 2013

    Additional facts

Location

Hankook Ipari Park
2400 Dunaújváros (Hungary)
References
2013.09.25 - 2014.11.10. között a Hankook Performace Tires megépítette új gyárát Dunaújvároson. A kivitelezés során betonüzemünk a gyártócsarnok sor építéséhez szolgáltatott betont. A összes betonszükséglet körülbelül 30 000 m3 betont jelentett, amiből a DDC 16 000 m3-t szállított.

Hankook Dunaújváros.