The reconstruction works on the Óbuda-Esztergom railway line started in 2013 with the cooperation of our company. The realization of the project was split into three phases: the first phase oversaw the building of the section between Esztergom and Piliscsaba, the second the Piliscsaba-Pilisvörösvár section, and the third the reconstruction of the Pilisvörösvár-Óbuda section. Our company transported 14770 m³ of concrete mixed by a recipe from the customer to the crew for the reconstruction of the given sections. In addition to TBG Dunakanyar Kft., A-Híd Zrt. and Cemex Hungária Kft. also participated in the project. The delivery ceremony was held at the Solymár station in August 2015.

Project details

  • 2015

    Completion

  • Project start: February 2013

    Additional facts

Location

Vasút utca
2085 Pilisvörösvár (Hungary)
References

Bridge at Bécsi street.

Bridge at Kálvária street.

Bridge at Kálvária street.

Bridge at Öreghegy street.

Pilisvörösvár railway station.

hormigón ligero.

Tunnel at Pilisvörösvár.

Viaduct at Tó street.

Solymár railway station.

Pilisvörösvár railway station.