Budapest - Esztergom Railway Line
The reconstruction works on the Óbuda-Esztergom railway line started in 2013 with the cooperation of our company. The realization of the project was split into three phases: the first phase oversaw the building of the section between Esztergom and Piliscsaba, the second the Piliscsaba-Pilisvörösvár section, and the third the reconstruction of the Pilisvörösvár-Óbuda section. Our company transported 14770 m³ of concrete mixed by a recipe from the customer to the crew for the reconstruction of the given sections. In addition to TBG Dunakanyar Kft., A-Híd Zrt. and Cemex Hungária Kft. also participated in the project. The delivery ceremony was held at the Solymár station in August 2015.
Location
Vasút utca2085 Pilisvörösvár (Hungary)
Bridge at Bécsi street.
Duna-Dráva Cement Kft.
Bridge at Kálvária street.
Bridge at Kálvária street.
Bridge at Öreghegy street.
Duna-Dráva Cement Kft.
Pilisvörösvár railway station.
Duna-Dráva Cement Kft.
hormigón ligero.
Tunnel at Pilisvörösvár.
Viaduct at Tó street.
Duna-Dráva Cement Kft.
Solymár railway station.
Duna-Dráva Cement Kft.
Pilisvörösvár railway station.
Duna-Dráva Cement Kft.
Bridge at Bécsi street.
Duna-Dráva Cement Kft.
Bridge at Kálvária street.
Bridge at Kálvária street.
Bridge at Öreghegy street.
Duna-Dráva Cement Kft.
Pilisvörösvár railway station.
Duna-Dráva Cement Kft.
hormigón ligero.
Tunnel at Pilisvörösvár.
Viaduct at Tó street.
Duna-Dráva Cement Kft.
Solymár railway station.
Duna-Dráva Cement Kft.
Pilisvörösvár railway station.
Duna-Dráva Cement Kft.